File |
Caption/Title |
Associated Technologies |
|
1
|

PLANTS.JPG
|
Plants were rescued and relocated before construction.
|
Plant rescue
|
|
2
|

EPA-bldg2.jpg
|
US EPA's main building at RTP.
|
General
|
|
3
|

EPA-LID11.jpg
|
No curb and gutter at edge of paved areas.
|
Bioswale
|
|
4
|

EPA-LID2.jpg
|
Grassy swales allow runoff to sheet flow over vegetated areas.
|
General, Biofilter/bioretention basin, Bioswale, Constructed wetland
|
|
5
|

EPA-LID6.jpg
|
Bioretention area captures and filters stormwater runoff.
|
Biofilter/bioretention basin, Bioswale, Constructed wetland
|
|
6
|

ATRIUM1.JPG
|
Central atrium.
|
General, Energy modeling software used, Daylighting, Daylighting
|
|
7
|

ROADLTS1.JPG
|
Photovoltaic lights along two-lane entrance road.
|
General, Innovative method for reducing paved area, Photovoltaic energy
|
|
8
|

OFFICE3.JPG
|
Offices have energy efficient lighting.
|
Highly efficient lighting system
|
|
9
|

LAB1.JPG
|
Energy-efficient laboratory.
|
Highly efficient lighting system,
|
|
10
|

CONCRET3.JPG
|
On-site concrete batch plant.
|
On-site manufacturing
|
|
11
|

WASTE1A.JPG
|
Construction waste separated for recycling.
|
General, Construction waste management plan, Recycling of construction/demolition waste
|
|
12
|

WASTE2.JPG
|
Dumpsters designated for different materials for recycling.
|
Construction waste management plan, Recycling of construction/demolition waste
|