| Project |
Completed |
Description |
Bldg Size |
Acreage |
Docs |
|
R.D. & Euzelle P. Smith Middle School |
2001 |
Many green building technologies and strategies were included in the design of this school. |
Over 100K sq. ft. |
Over 10 acres |
|
|
Carmichael Gymnasium, UNC-Chapel Hill |
1991 |
In 1991, UNC-CH reduced energy consumption in Carmichael Gymnasium by retrofitting its lighting system. |
25K to 100K sq. ft. |
N/A |
|
|
General Storeroom, UNC-Chapel Hill |
1991 |
In 1991, UNC-CH reduced energy consumption in the General Storeroom by retrofitting its lighting system. |
25K to 100K sq. ft. |
N/A |
|
|
Friday Center Park & Ride Lot, UNC-Chapel Hill |
2002 |
Porous asphalt and concrete were used to pave this park and ride lot. |
N/A |
N/A |
|
|
Hanes Art Center, UNC-Chapel Hill |
2001 |
A lighting upgrade at the Hanes Art Center replaced magnetic ballasts and T-12 lamps with more efficient electronic ballasts and T-8 lamps. |
25K to 100K sq. ft. |
N/A |
|
|
UNC-Chapel Hill (Waterfree Urinals) |
In Progress
|
In order to reduce water consumption, UNC-CH is installing 300 waterfree urinals across its campus. |
N/A |
N/A |
|
|
UNC-Chapel Hill (Closed-loop Cooling Systems) |
2003 |
UNC-Chapel Hill installed closed-loop cooling systems in its five largest water-consuming laboratory buildings on campus in order to reduce water consumption. |
N/A |
N/A |
|
|
Former Orange Industries Building, Orange County |
2001 |
Building was deconstructed |
5K to 10K sq. ft. |
Under 1 acre |
|
|
Orange Water and Sewer Authority Operations Center |
2004 |
The Orange Water and Sewer Authority’s Operations Center was constructed with numerous green features including skylights, waterless urinals, and recycled water vehicle wash. |
25K to 100K sq. ft. |
Over 10 acres |
|
|
Marcoplos-Sundermann eco-house, Orange County |
2001 |
Roof-integrated photovoltaics, solar water heating, materials from deconstruction, drainwater heat recovery, passive solar, passive cooling, radiant floor heating... |
Under 5K sq. ft. |
1 to 10 acres |
|